Start page

 Update 3-10-2009
 

  


  Our company


  Contacts


  Our products


  Prices


  Gallery
  

  


  Back


































































































































































































  Top
 
 Double take up
 machine
 One of the
 braiding
 machine which
 makes the
 screening of the
 coaxial cables
 Packing by hand
 TOMK 500m
 cables are ready
 to transport
 Fire alarm
 cables on wood
 drums
 Alarm cables in
 100m packages
 Storage
 Move the 
 products
 The trolley is
 indispensable
 to the loading
 One of our
 transporter
 vehicle.
 The team
 SAT-ELIT 2000's
 Park 
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
SAT-ELIT 2000
 
  Around  the
  globe, the 2
  wires alarm
  cable would
  weigh 560 tons

  "Secondary
  products"


 PVC
  
 Near ready
 products
 Diameter and 
 eccentricity
 gauge apparatus
 Wires feed the
 twister machine
 Inside of a
 twister machine
 A complete
 twisted string
 contains 16
 wires
 Phone cable is
 being made in
 the extruder
 One of the
 production line
 starts
 Extruder head
 Set the cable 
 printer up
 Front of a
 production line
 Twister
 machine's
 transmitters
 After the fire
 resistance
 inspection
 Cables in hell's
 fire
 Cables before
 the fire
 resistance
 inspection in
 the labouratory
 Copper in a
 transmitter
 
 Machine minder
 during work
 Fire alarm cable
 on a take up  
 machine's spool